In total 800 tonnes of Japanese knotweed and asbestos were removed through the Dig & Dump method with the job being completed within 5 weeks, and on budget.
Former steelworks, North London - Japanese knotweed infestation
Commercial development of residential housing, North London
The site of an old Steelworks needed to be cleared so that it could be used by a commercial development company to build residential housing.
TCM were hired to clear commercial fly-tip materials and asbestos as well as eradicate the Japanese knotweed infestation on the land.
Preparation of the site
We also undertook extensive tree removal and re-engineered a drainage feature before the commencement of these works.
This site had the added complication of a railway on one side and a canal on the other.
800 tonnes removed from location
In total 800 tonnes of Japanese knotweed and asbestos were removed through the Dig & Dump method, completed within 5 weeks and on budget.
We were able to guarantee all work with TCM’s comprehensive insurance backed warranty.